If an additional coat is needed and has had at least 4-5 hours to set up (at approximately 70 °F)*, lightly sand your surface with 400 – 600 grit sandpaper.  Then take a lint-free cloth, such as an old T-shirt (no tack cloths!), barely dampened with either acetone or alcohol and wipe your surface clean of the sanded particles.  Allow the acetone/alcohol to fully evaporate before mixing and applying the next coat. Your surface will look hazy after sanding but do not worry, this haziness will disappear once the 2nd coat of Glaze Coat dries.  Mix the next batch of Glaze Coat according to the directions and pour it on the surface.  

 

ROOM TEMP

PERIOD BETWEEN EACH ADDITIONAL COAT

70 °F

1 - 2 coats (4 - 5 hours)

3+ coats (24 hours. Not longer than 48 hours.)

 

*Warmer temperatures will yield faster cure times; colder temperatures will yield slower cure times.